Skip to main content

AirSource

Who chose what is on air. schedule is a block the clock changed over to and sustaining is what it plays in the hours no block claims — both are the schedule driving. operator is a person, including one who took over inside a scheduled block, and it holds until the next block begins. off is a station stood down

type AirSource = 'off' | 'schedule' | 'sustaining' | 'operator';